This is Central construction Specification Following below:


RCC framed structure Designed for seismic zone III. 9”thk 1st quality brick for outer walls. 4.5”thk 1st quality brick for inner walls.Base Level minimum 2'6" based-on Exiting  Road Level


24”X24” vitrified flooring for all rooms. 8”X 8” anti-skid ceramic tiles in toilets. 24”X24” Anti stain tiles in Kitchen.  24”x24” Rustic ceramic tiles in balcony.

Wall tiles

10”X14” ceramic tiles up to 7’0” height in toilets .  2’ ht dado ceramic tiles above granite platform in kitchen.


Black granite top kitchen platform with stainless steel sink


Main Door : Seasoned Teak wood frame & door with Melamine finish.

Bedroom Doors : Imported Padak wood frame & designed ready made doors finished with enamel paint.

Toilet Doors : Imported Padak wood frame & FRP doors

Windows : Imported Padak wood frames & shutters with enamel paint.

Window Grills : MS flat window grills finished with zinc chromate non corrosive paint.


Siemens Modular switches, Havells Multi strand copper wire and MCB’s and ELCBs.

Provision for light, fan and power points.

A/C point in all rooms.

TV & telephone points in living.

2 way points in all bedrooms.

Provision for washing machine & geyser points.


Parryware / equalent EWC and wash basin in white/light color, Jaquar/equalent CP fittings with wall mixer.

Health faucet will be provided.


RCC wardrobe in bedrooms and shelves in kitchen without shutters.


Internal walls : Finished with emulsion paint On putty.

External walls : Finished with exterior acrylic emulsion paint.

Water Supply

Bore well water in all tap points.

Packaged drinking water from RO plant.

Power Supply

3 phase power supply with automatic change over switch in each flat.

RMU transformer with advanced features.


Lights in Stair, around the buildings and terrace will be provided.

Bore well to a required depth.

Compound wall around the building.

Anti termite treatment as per norms.

Underground sump.

Sewage treatment plant.


8 passengers Johnson/equivalent lift with automatic rescue device.